Define scope and acceptance criteria
Confirm premises, occupied zones, hours, sensitive users, complaints and relevant benchmarks. Agree the parameters and pass criteria before treatment.
The attribution process separates the baseline, the intervention and the verified outcome. This helps clients understand what changed and what must be maintained.
Confirm premises, occupied zones, hours, sensitive users, complaints and relevant benchmarks. Agree the parameters and pass criteria before treatment.
Record occupancy, temperature, relative humidity, ventilation conditions and likely sources. Sample relevant parameters such as PM2.5, carbon dioxide, total VOCs and formaldehyde.
Prioritise source removal, ventilation, filtration, moisture correction and maintenance. Specify SmartCoat or another anti-pollutant treatment only where suitable for the identified issue.
Record product, treated surfaces or equipment, batch details, coverage, application date, contractor and curing or commissioning conditions.
Repeat agreed measurements after the stated stabilisation period. Compare conditions, methods and results against the baseline and acceptance criteria.
Review the full evidence chain. If the criteria are met, issue a unique certificate with scope, result date, limitations and recommended reassessment date, then publish its registry record.
The final test plan is risk-based. It avoids claiming causation where operating conditions or multiple interventions prevent a clean comparison.
The post-treatment results meet the agreed criteria, with an adequate and traceable evidence record.
Results improve but a control, operating condition or parameter needs correction before certification.
Results may be recorded, but the change cannot reasonably be linked to a specific treatment or control.
Certification reflects sampled conditions and the stated scope at a point in time. It does not guarantee that a space is free of every pollutant, pathogen or future air-quality risk.